Exams › IBPS PO › Quantitative Aptitude
Correct answer: 90 minutes
A+B together: rate=1/36. They work 30 min together then A works 10 min alone. 30×(1/36)+10×rate_A=1 → 5/6+10×rate_A=1 → rate_A=1/60 → A alone=60 min. Rate_B=1/36-1/60=(5-3)/180=2/180=1/90. B alone=90 min.
⚔️ Practice IBPS PO Quantitative Aptitude free + battle 1v1 →