Exams › SSC CGL (Prelims) › General › Data Interpretation
8 questions with worked solutions.
Answer: 187.5
The production of M3 over 4 days is 180, 190, 185, and 195. Their sum is 750, and dividing by 4 gives 187.5.
Answer: 5:4
Workers with less than 10 years' experience are those in the '< 5 years' and '5–10 years' groups. So Dept X has $8+12=20$ and Dept Y has $6+10=16$, giving the ratio $20:16 = 5:4$.
Answer: Z
For X, average = \((150+180+170)/3=500/3\). For Y, average = \((120+110+130)/3=360/3=120\). For Z, average = \((200+210+190)/3=600/3=200\), which is the highest.
Answer: Rs. 71.25 lakhs
For Product B, the quarterly revenues are 70, 72, 68, and 75. Their sum is 285, and 285 ÷ 4 = 71.25 lakhs.
Answer: 15.8 kWh
Sum of Flat 1 usage = 12+14+13+15+16 = 70. Sum of Flat 2 usage = 18+17+19+16+18 = 88. Total = 158, and the average over 10 days/entries is 158/10 = 15.8 kWh.
Answer: 14:67
The number of students in Section A is 6 + 10 + 14 + 16 + 9 + 7 + 5 = 67. The number of students with height 1.62 m in Section A is 14. So the required ratio is 14:67.
Answer: 13:12
Python-proficient students = Python only + both = 80 + 50 = 130. R-proficient students = R only + both = 70 + 50 = 120. Therefore, the ratio of Python to R is 130:120 = 13:12.
Answer: 187.5
The average daily production is the total output over 4 days divided by 4. For M3, the outputs are 180, 190, 185, and 195, whose sum is 750. So the average is 750/4 = 187.5 units.