The fuel cost functions in rupees/hour for two 600 MW thermal power plants are given by
Plant 1: C1 = 350 + 6P1 + 0.004P1²
Plant 2: C2 = 450 + aP2 + 0.003P2²
where P1 and P2 are power generated by plant 1 and plant 2, respectively, in MW and a is constant. The incremental cost of power (λ) is 8 rupees per MW. The two thermal power plants together meet a total power demand of 550 MW. The optimal generation of plant 1 and plant 2 in MW, respectively, are
- 200, 350
- 250, 300
- 325, 225
- 350, 200
Correct answer: 250, 300
Solution
Plant 1: dC1/dP1 = 6 + 0.008 P1 = 8 gives P1 = 250 MW. With total demand 550 MW, P2 = 300 MW (consistent with a + 0.006(300) = 8). The optimal dispatch is 250 MW and 300 MW, option (250, 350) being wrong; correct is (250, 300).
Related GATE Technical questions
- For an ideal MOSFET biased in saturation, the magnitude of the small signal current gain for a common drain amplifier is
- The most commonly used relay, for the protection of an alternator against loss of excitation, is
- The geometric mean radius of a conductor, having four equal strands with each strand of radius ‘r’, as shown in the figure below, is
- The Bode magnitude plot of a first order stable system is constant with frequency. The asymptotic value of the high frequency phase, for the system, is −180°. This system has
- In the circuit shown below, a three-phase star-connected unbalanced load is connected to a balanced three-phase supply of 100√3 V with phase sequence ABC. The star connected load has Z_A = 10 Ω and Z_B = 20∠60° Ω. The value of Z_C in Ω, for which the voltage difference across the nodes n and n' is zero, is
- A charger supplies 100 W at 20 V for charging the battery of a laptop. The power devices, used in the converter inside the charger, operate at a switching frequency of 200 kHz. Which power device is best suited for this purpose?
⚔️ Practice GATE Technical free + battle 1v1 →